Work Schedule Master

<< Click to Display Table of Contents >>

Navigation:  Job Costing > Table Maintenance >

Work Schedule Master

Previous pageReturn to chapter overviewNext page

Work Schedule Master control details used in the job work schedules.

 

Work Schedule Master

Department:

Enter the department using these work schedule defaults.

 

Jobs Per Day:

 

Other Jobs Per Day:

 

Max Jobs Friday:

 

Default Cost Centre:

 

Not Scheduled Start Date:

 

Days:

 

Hide Columns:

Columns are hidden when not required.

 

Hide CC
oNot used by electrical
Hide Variation
oNot used by electrical
Hide Type
oNot used by LAN
Hide Am/Pm
oNot used by electrical
Hide Supervisor
oNot used by LAN
Auto Add New Job Schedule
o

 

Work Type:

Used by Survey to display type in daily schedule (if type is not hidden). The entries are displayed on a popup for selection.

 

Absent Code:

Enter the absent codes used by the absent tab to indicate the reason for absentee.

Period:

Double click on period to display options for selection.